Statoil has shared a timelapse video of a heavy lift vessel Oleg Strashnov installing a 1,700-tonne topside onto a jacket on Dudgeon bank off Norfolk, UK. The topside and the jacket were built by Sembmarine SLP in Lowestoft and now form an offshore substation which once commissioned will collect and transform power generated at the 402MW Dudgeon offshore wind farm. The topside was […]
↧