The second cable installation phase at the Global Tech I offshore wind farm has started. The first cables have already been laid between the foundations and pulled into them, and now it is time for them to be flushed into the ocean floor by the installation vessel Cable Innovator and its Remotely Operated Vehicle (ROV) [...]
↧