It was recently reported by VSMC that the first cables were installed at Nordsee Ost wind farm. In addition to this report CPNL Engineering received a preliminary review that the cable protection system functions as ordered by customer RWE Innogy GmbH. RWE claims to be completely satisfied with the installation, as the system fits perfectly […]
↧