Quantcast
Channel: Grid Connection – Offshore Wind
Viewing all articles
Browse latest Browse all 1803

Rentel Makes Topside Travel Arrangements

$
0
0
Rentel NV will start the transport of the offshore transformer substation topside built for the 309MW Rentel offshore wind farm from the assembly yard in Saint-Nazaire, France to the installation site in the Belgian North Sea on 12 January.

Viewing all articles
Browse latest Browse all 1803

Trending Articles