VBMS has completed the repair of an inter-array cable at Trianel Windpark Borkum phase 2. The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable which was completed in less than 48 hours, from arrival to departure. The works were executed in the German […]
↧